How to Lay a Concrete Footpath

Materials and Tools You'll Need

  • Concrete mix (ready-mix or make your own)

  • Gravel or crushed rock for the base

  • Timber or metal edging for the formwork

  • Wheelbarrow, shovel, and trowel

  • Level and measuring tape

  • Wooden stakes and string

  • Concrete screed or a flat board

  • Water source and hose

  • Safety gear (gloves, safety glasses, and boots)

  • Concrete Mixer, or ready mixed via a supplier


Step-by-Step Guide

1. Plan Your Path

  • Mark out the desired path using stakes and string to create a clear outline.

  • Ensure the path is at least 75mm thick and incorporates a slight slope to allow water runoff and prevent pooling.

2. Prepare the Ground

  • Excavate the area to a depth of 100-150mm, ensuring the surface is even.

  • Lay a layer of gravel, crushed rock or compacted sand and soil (50mm thick) and compact it firmly using a hand tamper or plate compactor to create a stable base.

3. Set Up the Formwork

  • Install timber or metal edging along the marked outline to create the formwork.

  • Secure the formwork with wooden stakes spaced 500mm apart. Double-check that everything is level, straight, and follows the intended shape of the path.

4. Mix and Pour the Concrete

  • Prepare the concrete according to the manufacturer's instructions. If mixing manually, ensure the consistency is thick but workable.

  • Pour the concrete evenly into the formwork in manageable sections, spreading it with a shovel to fill all gaps.

5. Level and Finish the Surface

  • Use a screed or flat board to level the concrete, moving it back and forth over the surface to achieve an even layer.

  • Smooth the surface with a trowel for a clean finish or use a broom to create a textured surface for better slip resistance.

6. Curing and Maintenance

  • Cover the footpath with a damp cloth or plastic sheet for 24-48 hours to retain moisture and prevent cracks during curing. You can use a weep hose to help in particular hot environments.

  • Avoid walking on the footpath for at least 7 days and allow 28 days for the concrete to reach full strength.


Additional Tips for Success

  • Work in manageable sections: For longer paths, divide the work into smaller sections to prevent the concrete from setting before it's finished.

  • Add expansion joints: Insert expansion joints every 2-3 metres using a grooving tool or strips of wood to prevent cracks caused by temperature changes.

  • Check for weather conditions: Avoid pouring concrete in extreme heat, cold, or rain, as these conditions can affect curing and strength.

  • Reinforcement for heavy loads: If the path will bear heavy loads (e.g., wheelbarrows or carts), consider adding steel mesh or rebar for extra reinforcement.


Common Mistakes to Avoid

  • Uneven surfaces: Ensure the ground and base are level before pouring concrete.

  • Rushing the curing process: Proper curing is essential to achieve a durable surface. Avoid shortcuts during this step.

  • Inadequate base preparation: Skipping the gravel base can result in sinking or cracking over time.

By following these steps and tips, you'll be able to lay a durable and functional concrete footpath that enhances your outdoor space.